West 8th Avenue Sidewalk Project

Share West 8th Avenue Sidewalk Project on Facebook Share West 8th Avenue Sidewalk Project on X (formerly Twitter) Share West 8th Avenue Sidewalk Project on Linkedin Email West 8th Avenue Sidewalk Project link
An attached sidewalk, which means there is no separation such as a landscaped area between the roadway and the sidewalk.

Lakewood is committed to creating a safe, accessible, and connected pedestrian network throughout the community. As part of this effort, the city is developing the West 8th Avenue Sidewalk Project, which will provide a continuous pedestrian route along the north side of West 8th Avenue between Independence and Garrison streets.

The city selected the north side to provide the most direct connection between Lakewood High School and the existing signalized crossing at Garrison Street while also connecting to the existing neighborhood sidewalk network. The project will address a gap in the sidewalk network and provide a safer, more comfortable route for students and other pedestrians who currently walk along the roadway or shoulder. Students living within 2.5 miles of the school are not eligible for school bus transportation per Jefferson County Public Schools Transportation Guidelines (see the frequently asked questions section), so a continuous sidewalk connection is especially important for students who walk to school.

The project aims to improve pedestrian safety and accessibility while also improving stormwater drainage and runoff by installing raised curbs, gutters, and inlets to reduce localized flooding and erosion.

Learn about this project:

Lakewood is committed to creating a safe, accessible, and connected pedestrian network throughout the community. As part of this effort, the city is developing the West 8th Avenue Sidewalk Project, which will provide a continuous pedestrian route along the north side of West 8th Avenue between Independence and Garrison streets.

The city selected the north side to provide the most direct connection between Lakewood High School and the existing signalized crossing at Garrison Street while also connecting to the existing neighborhood sidewalk network. The project will address a gap in the sidewalk network and provide a safer, more comfortable route for students and other pedestrians who currently walk along the roadway or shoulder. Students living within 2.5 miles of the school are not eligible for school bus transportation per Jefferson County Public Schools Transportation Guidelines (see the frequently asked questions section), so a continuous sidewalk connection is especially important for students who walk to school.

The project aims to improve pedestrian safety and accessibility while also improving stormwater drainage and runoff by installing raised curbs, gutters, and inlets to reduce localized flooding and erosion.

Learn about this project:

Ask a question

Ask your question here, and city staff will respond within three business days. Questions and answers about this project can be visible to the public.  

For general questions and concerns about the city, please visit LakewoodCO.gov/Request(External link)(External link)(External link), which is the city's online customer service hub available 24 hours a day. 

Email
loader image
Didn't receive confirmation?
Seems like you are already registered, please provide the password. Forgot your password? Create a new one now.
  • Share How can you propose a street for future sidewalk build outs?? on Facebook Share How can you propose a street for future sidewalk build outs?? on X (formerly Twitter) Share How can you propose a street for future sidewalk build outs?? on Linkedin Email How can you propose a street for future sidewalk build outs?? link

    How can you propose a street for future sidewalk build outs??

    Tanja asked 8 days ago

    To request a new sidewalk, please visit the city's customer service hub at www.LakewoodCO.gov/Request. Then enter "sidewalks" in the "Search topics" box. A drop-down menu will appear that includes "Request a New Sidewalk." Click on that item, which will then allow you to "Create request" for this. Your request will be sent to staff for including in the prioritization list for sidewalk improvements. You should also receive a response acknowledging your submittal.

    Kind regards,

    The Project Team 

Page last updated: 04 Nov 2026, 11:16 AM